• Exact matches only
    Search in title
    Search in content
    Search in comments
    Search in excerpt
    Search in posts
    Search in pages
    Search in groups
    Search in users
    Search in forums
    Filter by Custom Post Type
    Filter by Categories
    GREENHOUSE
    News And Activity
    Our Product And Services
    Our Projects
    Uncategorized

TO SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF 1 UNIT OF AGROGREEN SYSTEM MODEL PGH-920A

TITLE: TO SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF 1 UNIT OF AGROGREEN SYSTEM MODEL PGH-920A TO MALAYSIAN NUCLEAR AGENCY (NUCLEAR MALAYSIA), BANGI, SELANGOR.

Customer: Malaysian Nuclear Agency (Nuclear Malaysia), Bangi, Selangor.

Year: 2007

Project summary:

This is project where ESI as been offered to design and build tropical research greenhouse with state or art Irrigation/Fertigation system, growing system and Climate control system for R&D purpose. In order to provide a good working system, we have visited our nearby country like Indonesia, Philippines, Thailand and Australia. Finally we discovered that, AGROGREEN PGH-920A will be most suitable for Malaysian climate. Hence we design the entire project based Agrogreen design. It took 4 months to complete the project. The overall job included:-

  1. Structure
  2. Climate Control
  3. Growing System
  4. Irrigation / Fertigation System

This type of greenhouse consists of different side netting, thermal screen and climate control system. It also designed for for virus sensitive plant like tomato and others. We provide complete system carried with drip and the misting type of irrigation.

W

Author: client007

Share This Post On