Groundwater Project

Tube Well Boring

Including mobilisation, drilling and construct and concrete slab with fences.

Package includes:

Mobilisation

Mobilise drilling rig, equipment and others .

Concrete Slab with Fence

Construction of concrete slab, 6' well head, plate for well reference and fences using chain link.


Drilling and Construct

(a) Drilling: Drill 5-6" borehole in the alluvium formation

I. 0-10 meter depth
II. 10- 20 meter depth
III. 20- 30 meter depth

(b) Well Construction: Construct 4" uPVC pipe Class D SIRIM including gravel pack between annulus.

I. 0-10 meter depth
II. 10- 20 meter depth
III. 20- 30 meter depth

Get Your Free Quote
TODAY!


Request a Quote

For more Information please
download our brochure


Download Brochure