Groundwater Project
Tube Well Boring
Including mobilisation, drilling and construct and concrete slab with fences.
Package includes:
Mobilisation
Mobilise drilling rig, equipment and others .Concrete Slab with Fence
Construction of concrete slab, 6' well head, plate for well reference and fences using chain link.Drilling and Construct
(a) Drilling: Drill 5-6" borehole in the alluvium formationI. 0-10 meter depth
II. 10- 20 meter depth
III. 20- 30 meter depth
(b) Well Construction: Construct 4" uPVC pipe Class D SIRIM including gravel pack between annulus.
I. 0-10 meter depth
II. 10- 20 meter depth
III. 20- 30 meter depth